The challenge
A new heavy-haul rail alignment through remote Pilbara country needed ground data along its full length before track laying could begin.
Our approach
- 1Planned investigations along the 400 km alignment
- 2Collected and tested ground samples
- 3Delivered design parameters to the rail design team
Outcome
Ground investigation results and geotechnical design parameters for the 400 km alignment were delivered to the rail design team.