Skip to content
Talk to an engineer +61 414 955 631

Track record

Perth CBD high-rise

Foundation pile testing and vibration monitoring for a 50-storey tower.

Client
Confidential client
Location
Perth, WA
Sector
Civil infrastructure
Aerial view of the Perth central business district
Illustrative image

The challenge

Foundations for a 50-storey tower in a dense city centre had to be verified while protecting neighbouring buildings from construction vibration.

Our approach

  1. 1Integrity testing of foundation piles
  2. 2Vibration monitoring at neighbouring structures
  3. 3Results reported against AS 2159

Outcome

Pile integrity test results were reported against AS 2159, and vibration monitoring results at neighbouring structures were reported to the project team.

More civil infrastructure projects

  • Civil infrastructure

    Melbourne, VIC

    West Gate Bridge strengthening

    Non-destructive testing and structural assessment for strengthening works on Melbourne’s landmark bridge.

  • Civil infrastructure

    Melbourne, VIC

    Melbourne Metro Tunnel

    Structural testing and integrity monitoring for Melbourne’s Metro Tunnel.

  • Civil infrastructure

    Regional NSW

    Highway bridge assessment

    GPR scanning and concrete strength assessment for ageing bridge assets.

Have a similar project?

We can mobilise engineers and equipment across Australia at short notice.