Skip to content
Talk to an engineer +61 414 955 631

Track record

Highway bridge assessment

GPR scanning and concrete strength assessment for ageing bridge assets.

Client
Confidential client
Location
Regional NSW
Sector
Civil infrastructure
Underside of a concrete highway bridge deck and pier
Illustrative image

The challenge

Bridge widening works required drilling into ageing concrete without damaging existing reinforcement.

Our approach

  1. 1Ground penetrating radar scanning of bridge elements
  2. 2Concrete strength assessment
  3. 3Reinforcement maps issued to the construction team

Outcome

Reinforcement maps and concrete strength results were issued to the construction team to guide drilling locations for the widening works.

More civil infrastructure projects

  • Civil infrastructure

    Melbourne, VIC

    West Gate Bridge strengthening

    Non-destructive testing and structural assessment for strengthening works on Melbourne’s landmark bridge.

  • Civil infrastructure

    Melbourne, VIC

    Melbourne Metro Tunnel

    Structural testing and integrity monitoring for Melbourne’s Metro Tunnel.

  • Civil infrastructure

    Perth, WA

    Perth CBD high-rise

    Foundation pile testing and vibration monitoring for a 50-storey tower.

Have a similar project?

We can mobilise engineers and equipment across Australia at short notice.